Skip to product information
1 of 9

Stamina

Stamina Power Tower - Dip Bar Pull Up 250 lbs

Stamina Power Tower - Dip Bar Pull Up 250 lbs

Regular price $559.99
Regular price $615.99 Sale price $559.99
Sale Sold out
Shipping calculated at checkout.

About This

  • STAMINA POWER TOWER - Our Power Tower provides a total body workout, suitable for building strength and muscle, improving muscle tone, and losing weight. Using this pull up bar station improves your figure, posture, mobility, balance, and overall fitness health.
  • UNIQUE BOULDER GRIPS - The heavy-duty loops of this power tower keep your back and arms supported during leg and knee raises. This dip station is also equipped with boulder grips that emulate rock-climbing for an increased grip and forearm strength.
  • BUILT-IN PLYO BOX - This pull up bar station features a plyo box that adjusts from 16"-18"-20"-22"-24" in height. With a durable textured surface, this step platform allows a variety of power-boosting exercises including squat jumps, step-ups and calf raises.
  • STABLE AND SPACE SAVING - The durable steel frame of this dip bar tower supports powerful workouts of users up to 250 lbs. Our pull up bar provides multiple workout stations that fit easily in any indoor or garage space.
  • SMART WORKOUT APP - Experience connected fitness with this home gym equipment with the müüv app. With smart guided coaching, exercise demo videos, personalized workouts, assembly videos, and more, müüv provides the best workout and fitness experience with your Stamina Pull Up Bar.

Overview

  • Brand : Stamina
  • Material : Steel frame
  • Color : Fortress Red
  • Handle Type : Fixed
  • Maximum Weight Recommendation : 330 Pounds
View full details

Cycling

"Ride harder. Go further."

From indoor cycling setups to essential bike accessories, elevate your training and endurance. Perfect for those chasing performance or just enjoying the ride.

shop

Weights & Bars

"Build strength, your way."

Discover premium dumbbells, barbells, and adjustable weights designed for every fitness level. Whether you’re lifting at home or in the gym, these tools help you push past limits and see real progress.

shop

Massage & Therapy

"Recover like a pro."

Speed up recovery and relieve tension with our massage rollers, therapy tools, and recovery gear. Essential for keeping your body strong, flexible, and ready for the next workout.

shop

Frequently Asked Questions

Yes, we provide free standard shipping on all orders over $100. For orders under $100, a small shipping fee applies, which will be shown at checkout.

If you're not completely satisfied with your purchase, you can return it within 14 for a full refund. Please ensure the item is unused and in its original packaging.

Need professional headshots quickly? headshots.so, headshots.dk, headshots.se, and headshots.no make it easy to produce high-quality images in just a few minutes. Whether you’re updating your LinkedIn profile or website, these platforms help you get a polished look without any hassle.